Schmolck Mechanical Contractors performs plan/specification and design build projects throughout Southeast Alaska. In addition we maintain retail plumbing stores, sheet metal fabrications shops and service departments providing retail sales and service in Ketchikan, Sitka and Juneau.

Our projects range in scope from the smallest service jobs to $11 million commercial projects. We have staff of highly experienced plumbers, mechanics and sheet metal workers who have successfully completed projects in Alaskan communities from Metlakatla to Napaskiak. Schmolck maintains annual sales of $15 to $25 million; this volume enables us to keep a staff of approximately 40 people which gives owners and General contractor’s access to the largest Mechanical work force in Southern Alaska. Our size allows us to easily shuffle manpower to where it is most needed and is an essential part of why Schmolck mechanical is your best choice in Southern Alaska when you want your job done right and on time.







Current Projects




Project:UAS Dorms

Location: Juneau, AK
Date Completed:
SMC Contract:$1,700,000

Description:


This project consisted of constructing two new 5 story dormitory buildings for housing at the University of Alaska Southeast



Past Projects




Project:Ketchikan Shipyard Assembly Hall & Production Facility

Location: Ketchikan AK, AK
Date Completed:
SMC Contract:$6,000,000

Description:


The project consisted of constructing a new ship assembly hall and adjoining 5 story production centers at the Ketchikan Shipyard. This was a design assist project which allowed us to work side by side with the engineers during the design phase; this collaboration helped to reduce costs and streamline the installation process. One of the challenges presented by this project was working in the ceiling of the assembly hall which had a substantial amount of piping and duct work and was 120’ floor to ceiling. We reduced the amount of time spent working at 120’ by pre-fabricating the majority of the piping on the ground and hoisting it into the ceiling.